Shumat Energy Distribution Project

Homepage / Shumat Energy Distribution Project

Shumat Energy Distribution Project

  • 09/01/2021
  • 2830

Shumat Energy Distribution Project:
5 standard full trucks and a 108 ton
transformer station from Ankara, Turkey
to Shumat, Albania project is still in
progress. 13 axle and 32 meters long
lowbed will be reduced down to 26 meters
in Shupenze. Transformer will be taken
of the pool to the axles through hydraulic
shifting system.